Eastvale Dam – Beaver Falls, PA
Provided emergency response to protect water supply of BFMA
- Construction of cofferdam to divert current around breached section of dam on Beaver River
- Diamond wire sawing, demolition, and removal of failed structure
- Cleaning of bedrock
- Underwater placement of concrete footing – 3,400 CY continuous pour
- Self performed layout of doweling and structure location
- Forming, reinforcement, and pouring of new 130′ hyperbolic dam structure
- Restoration and removal of temporary cofferdam